Home Contact Sitemap login Checkout


Integral Pipeline Technologies
  • Home
  • Pipeline Isolation
    • Pipeline Isolation
    • Integral IsoTool
    • IsoTool Results
      • IsoTool Results
      • IsoPurge White Paper
    • Safety by Design
  • Pig Tracking
  • ROW Services
  • About
    • About
    • Vision Statement
    • Health and Safety
    • Careers
  • Contact
Print This Page

20” and 16” IsoTools Deployed to Same Facility

By Jordan Dyck, Integral Pipeline Technologies


Client requested

One of our regular clients had a 20” receive valve and a 16” launch valve leaking in the same yard.



Understanding the best solution

Integral arrived with both diameter tools and completed both sets during the same mobilization, further saving the client money.



Planning and delivery

The 20” was launched 57 miles away and tracked until it was parked 400’ US of the trap.  The IsoTool was set in under 45 minutes, and drain-up was less than 20 bbls.  The valve was replaced and the tool was unset and pushed to trap.

 

The 16” was launched out 80’, and set.  The crew replaced the leaking valve, the tool was unset and tracked to trap.




Service completion report

Both of these projects occurred within 3 days.  This allowed for an effective utilization of resources and a swift solution to multiple integrity concerns.









Advanced Technology | Experience | Integrity

Contact Us

Contact

1 (780) 886-1067

info@integralpipe.com

Corporate Office USA

4 Finestkind Ln

Kennebunk, ME 04043

Corporate Office Canada

12001 - 149 Street

Edmonton AB T5L 2J2

© Integral Pipeline Technologies 2019

Privacy Policy