Home Contact Sitemap login Checkout


Integral Pipeline Technologies
  • Home
  • Pipeline Isolation
    • Pipeline Isolation
    • Integral IsoTool
    • IsoTool Results
      • IsoTool Results
      • IsoPurge White Paper
    • Safety by Design
  • Pig Tracking
  • ROW Services
  • About
    • About
    • Vision Statement
    • Health and Safety
    • Careers
  • Contact
Print This Page

“Quick and Easy”
Valve Change Out

By Jordan Dyck, Integral Pipeline Technologies


Client requested

A launch valve on an 80-year-old pipeline was showing its age and needed to be replaced.  



Understanding the best solution

A 10” IsoTool was pumped out 20 feet past the valve and set in 36 minutes.  After the 30-minute Isolation Assurance Test, the valve was pulled and a new valve was installed.  



Planning and delivery

The mechanical work took 2 hours, and the IsoTool was unset in 36 minutes.  The pipeline back up and running in less than 4 hours.  


Service completion report

This is the 3rd trap valve the IsoTool has replaced on this system, and the client plans to remove several more in the coming months.










Advanced Technology | Experience | Integrity

Contact Us

Contact

1 (780) 886-1067

info@integralpipe.com

Corporate Office USA

4 Finestkind Ln

Kennebunk, ME 04043

Corporate Office Canada

12001 - 149 Street

Edmonton AB T5L 2J2

© Integral Pipeline Technologies 2019

Privacy Policy